refid:11952537 ilişkili resim dosyası
The plant at Tufanbeyli, near Adana, may cost as much as 800 million euros, said Selahattin Hakman, chairman of Enerjisa, a joint venture of Sabancı Group and Verbund. The company, whose current capacity is 455 megawatts, aims to generate 5,000 megawatts by 2015, he told reporters in Istanbul Thursday night. Sabancı, Turkey’s second-biggest industrial group, and Verbund, Austria’s biggest utility, formed Enerjisa in 2006 to invest in power production and distribution in Turkey, wheregrowing demand for electricity is creating the need for more generation capacity.